BuoyBot-Egg build guide
Reproduced from the project's own build guide for BuoyBot-Egg, the printed ball hull. The renders come from its 3D model. Only the dome has been printed so far, and nothing has been floated, so every other figure is from the model, the slicer or the hydrostatics. The print files — a slicer project per part, with its settings — download from step 2. The itemised parts list, the wiring guide and the carrier-board documentation are kept with the project and are not published here — references to them appear below in plain text.
Step-by-step instructions for building one BuoyBot-Egg: the printed ball buoy. The hull is printed on a 250 mm FDM printer, and the rest is bought parts, a soldering iron and a few hand tools.
| Applies to | the BuoyBot-Egg design of 2026-10-19 (commit d8178f1): 236 mm printed PLA ball; two pods in tunnels behind grille plugs; one stock 6 Ah battery pack; dome sealed by two radial O-rings and held by a printed union ring; lead cast in a dish under the hull |
| Units | millimetres |
| Status | Only the dome has been printed so far (2026-11-10, from dome.3mf, in PLA, no supports). Nothing has been floated. Every other figure here comes from the model, the slicer or the hydrostatics script. Treat the first buoy as a test article |
| Why it is built this way | EGG_BUOY_DESIGN.md |
| Buy first | PARTS_ORDER.md, the spar's electronics plus the list in EGG_BUOY_DESIGN.md §10 |
| Wiring reference | WIRING_GUIDE.md; the carrier is wired as on the spar (BUILD_GUIDE.md step 6.3) |
| Source of every dimension | design/egg/egg_dims.py: the Fusion model, the print files and this guide all read from it |
Contents
- What you are building
- Before you start: directions, schedule, cure times, safety, tools, printer
- Print and prepare:
- Fit and test the shell:
- Fit it out:
- Test and trim:
- Appendices:
What you are building


A ball 236 mm across and 351 mm tall that floats with its waterline 5 mm below the shoulder the ring sits on. Two thruster pods sit inside fore-and-aft tunnels in the lower hull, behind grilles, so nothing sticks out. A dish of lead cast in epoxy is screwed under the hull to keep it upright. It rights itself from any angle.
It is made of four modules:
| Module | What it is | When you service it |
|---|---|---|
| Hull | the printed hull with its two tunnels, the pods clamped in them by four grille plugs and two tie rods, two cable glands, the battery on its bulkheads and the two ESCs | stays put |
| Deck | a 204 mm printed plate carrying the carrier PCB and the GPS board, with a mast for the compass shelf, the Feather shelf and the antenna platform | lifts out |
| Dome and ring | the printed dome with its two O-rings, the SP13 charge/ON socket (bow) and the test valve (stern); the ring that holds it down | lifts off |
| Ballast dish | a printed dish of lead cast in epoxy, with a rope eye underneath | screwed on once the float test has set the lead |
The dome comes off by hand: unscrew the ring 1⅓ turns and lift. That gives a 205 mm opening. Only one lead crosses the joint, from the SP13 to the deck, and it unplugs.
Three things about the design shape the whole build:
- Measure the pod's lug before printing the hull. The keyway for it is a guess (22 × 8 mm); the datasheet does not give it (step 1).
- Supports stay off. Every part was checked layer by layer and prints without them. The slicer will offer support if asked, and it is not needed (step 2).
- The lead is not cast until the buoy has floated. The right amount depends on what your parts really weigh. It goes in as loose bags, is set at the float test (step 13), and is cast only then (step 15).
Before you start
Directions
The buoy has a bow: the direction the thrusters push it.
- Bow / stern: front / back. The bow is marked three ways: the key in the hull's rim, the notch under the dome's flange, and the SP13 socket on the dome. The test valve is at the stern.
- Port / starboard: left / right for someone behind the buoy, looking toward the bow. ESC L drives the port pod.
Write BOW on the hull, the dome and the deck as soon as each is printed. The deck only fits one way round: it drops over a peg on the bow-port rib.
Where measurements start
Heights (z) are millimetres above the lowest point of the finished buoy, the flat underside of the ballast dish. The hull's own bottom is at z 25.
| z | What is there |
|---|---|
| 0 | underside of the ballast dish |
| 25 | underside of the hull |
| 65 | tunnel axes |
| 113 | top of the carrying bulkheads: the battery's seat |
| 180 | underside of the deck |
| 200 | the still waterline |
| 205 | the shoulder the ring sits just above |
| 223 | the hull's rim |
| 351 | top of the dome |
Schedule
The printing takes most of the calendar. The rest is set by cure times.
| Stage | Steps | Work | Left to cure |
|---|---|---|---|
| 1, 2 | about 52 h of printer time; the hull alone is 26½ h | — | |
| Day 1 | 3, 4 | clean up, tap, inserts; first epoxy coat | epoxy coat |
| Day 2 | 4, 5, 6 | second coat; dome fittings; dry fit | epoxy coat |
| Day 3 | 7–13 | pressure test, fit-out, bench test, float trim | — |
| Day 4 | 14, 15 | thrust and current; cast the ballast | ballast epoxy |
| Day 5 | 15 | dish on, self-righting, first water | — |
Cure times
| Job | Before the next operation | Before a pressure test |
|---|---|---|
| Laminating epoxy coat | per the epoxy's data sheet, typically 24 h | 24 h |
| Slow epoxy, ballast cast | 24 h | — |
| Heat-set inserts | until cool, a minute or two | — |
Cold slows everything: below 15 °C, double these.
Safety
- Lead shot: nitrile gloves, no food or drink on the bench, wash hands, sweep up strays.
- Epoxy: gloves and ventilation. Mix by weight.
- Heat-set inserts and the tap: the iron is hot enough to burn; keep the tap square, so the thread is not cut crooked into a printed column.
- Battery: LiFePO4 packs do not burn like LiPo, but they will weld a dropped wrench. Insulated tools, tape bare leads, connect the pack last.
- Pressure tests: hand pump only, never a compressor. The test is 0.1 bar (1.5 psi) and no more: the shell is printed.
- Motor tests: the propellers sit behind grilles but are sharp at several thousand rpm. Keep fingers out of the tunnels; short bursts.
- Heat: the shell is PLA, which softens from about 55 °C. A closed car in summer, a hot dock, or a red shell out of the water in full sun all get there. A softened bore or spigot goes out of round and stops sealing. Keep it shaded when it is out of the water, and never leave it in a car.
Working rules
- Dry-fit before anything is permanent. Inserts, epoxy and the cast lead can't be undone.
- Label both ends of every wire as you cut it.
- Weigh, do not estimate: ballast, epoxy and the finished buoy.
- Pass each Check before moving on. Every check is quick now and expensive once the dome is on.
Tools
| Tool | Used for |
|---|---|
| The printer (250 × 250 × 250 mm build volume) and about 2 kg of PLA | every printed part |
| M16 × 1.5 tap and tap wrench | the gland columns |
| Soldering iron with a heat-set insert tip | M4 and M3 inserts; wiring |
| Drill with a 4.5 mm bit | the grille plugs' rod holes |
| 400 and 600 grit wet-and-dry; a deburring knife | the sealing bore; print clean-up |
| Calipers, steel rule, fine marker | the lug; checks |
| Hex keys and a 7 mm spanner or nut driver | M4 and M3 screws; tie-rod nuts |
| Kitchen scale (5 kg × 1 g); luggage scale (to 20 kg) | lead and epoxy; part weights, finished mass, thrust |
| Clamp meter (DC) | battery current at the thrust test |
| Bicycle floor pump with a Schrader head and gauge | pressure tests |
| A tub, water butt or bath big enough to submerge the buoy; weights | pressure tests; the tub thrust test |
| Heat gun, wire strippers, multimeter | wiring |
Consumables: laminating epoxy (about 300 g in all, coat and ballast), silicone grease, adhesive-lined heat-shrink, zip ties, isopropyl alcohol, masking tape, nitrile gloves, mixing cups, desiccant, solder.
Printer and filament
All parts print in PLA on the slicer's stock Anycubic PLA and 0.20 mm Standard profiles for a 0.4 mm nozzle (205 °C nozzle, 215 °C for the first layer, 55 °C bed), with these changes:
| Setting | Value | Why |
|---|---|---|
| Walls | 6 | the 2.6 mm skin prints as solid perimeters |
| Top / bottom layers | 5 / 5 | |
| Infill | 15 % gyroid | |
| Seam | random | each loop starts in a new place, so the start points never line up into one path up the part |
| Supports | off | no part needs them (step 2) |
| Brim | 10 mm, outside and inside | holds the first layer down; inside, it also fills each hole in the bed face, to pick out after (step 2) |
| Prime tower | off | one filament |
A slicer project (3MF) per part, already turned to its print orientation and with these settings in it, downloads from step 2. The print-ready STLs are kept with the project in design/egg/print/.
PETG instead. PETG softens at 70–80 °C rather than PLA's 55 °C, gives less under constant load and cracks less readily. It is the upgrade if heat or knocks prove a problem, at least for the hull, dome and ring. The same projects print it: open the project, then change only the filament preset to Anycubic PETG (230 °C nozzle, 75 °C bed).
Print and prepare: steps 1 to 4. Measure first, then print, then turn the prints into parts.
Step 1 — Measure the pod's lug
Time: 15 min. You need: one thruster pod; calipers.
Each pod has a mounting lug on its side. It rides in a keyway on the outboard side of its tunnel, which stops the pod turning under motor torque. The lug's size is not in the datasheet, so the keyway is drawn 22 mm tall, reaching 8 mm beyond the 72 mm bore, as a guess.
- Measure the lug: its height (along the pod's diameter), how far it stands out from the 69 mm duct, and where along the duct it sits.
- Compare. The pod rests on the floor of the 72 mm bore, so its axis is 1.5 mm below the tunnel's. With the pod there, the lug must fit inside a slot 22 mm tall (11 mm either side of the tunnel axis) reaching 44 mm from the tunnel axis, with a millimetre or two to spare.
- If the lug reaches past the end of the duct, check it also clears the 16 mm notch in each grille plug's sleeve.
- If it does not fit: change
SLOT_W(height) andSLOT_D(depth beyond the bore) indesign/egg/egg_dims.py, rebuild the model withdesign/egg/fusion_egg.py, and re-runprint_prep.py,print_verify.pyandslice_parts.pybefore printing the hull.
Check
Step 2 — Print the parts
Time: about 52 h of printer time; minutes of yours per print.
Print from the 3MF project files in the table, not from STLs. Each project holds its part already turned the right way up on the bed, with the settings it was checked with:
- six walls, so the 2.6 mm skin prints solid and watertight;
- 0.2 mm layers;
- slowed overhangs with the fan up;
- a 10 mm brim outside the part and inside its holes, to hold it down;
- a random seam;
- no supports.
An STL sliced with another profile loses all of that. The first dome was printed that way and failed as spaghetti.
- Open the 3MF as a project in Anycubic Slicer Next (File → Open Project, or drag it in and pick Open as project). Import geometry only drops the settings.
- Check, before slicing, that the project's settings are still the ones in use. Picking another process preset from the list replaces them.
- The printer is the Kobra S1 0.4 nozzle, the plate is the High Temp Plate, and the filament is Anycubic PLA.
- The process preset reads BuoyBot-Egg watertight, not one of your own.
- Strength → Walls shows 6 wall loops.
- The brim is outer and inner, 10 mm wide (Others), and the seam position is Random (Quality).
- Slice and print.
| Part | File | Copies | On the bed | Time | PLA |
|---|---|---|---|---|---|
| Hull | hull.3mf | 1 | flat bottom | 26.5 h | 970 g |
| Dome | dome.3mf | 1 | spigot rim | 9.3 h | 354 g |
| Deck | deck.3mf | 1 | plate | 4.3 h | 143 g |
| Ring | ring.3mf | 1 | lip down (upside down) | 3.9 h | 133 g |
| Ballast dish | ballast-dish.3mf | 1 | flat bottom | 3.4 h | 117 g |
| Grille plug, port bow and starboard stern | grille-plug-pb.3mf | 2 | outer face | 0.9 h each | 35 g each |
| Grille plug, port stern and starboard bow | grille-plug-ps.3mf | 2 | outer face | 0.9 h each | 35 g each |
| Antenna platform | antenna-platform.3mf | 1 | disc down (upside down) | 0.8 h | 29 g |
| Total | 10 | 52.0 h | 1.89 kg |
The grams are the filament each print uses, as the slicer reports it, brim included. The brims take 16 g in all and come off, so the parts themselves weigh 1.87 kg. The ring's brim comes within 2 mm of the edge of the 250 mm bed: it fits, but do not move the ring off the bed's centre.
Printed so far: the dome, from dome.3mf on a Kobra S1 on 2026-11-10, before the project had a brim. It took 7 h 46 min (the slicer then estimated 9.0 h): 792 layers, 356.5 g of PLA, no supports, no failures.
The grille plug comes in two hands, mirror images of each other, because its keyway lobe must sit outboard. Print each of the two plug files twice. Mark each plug with its corner (PB, SS, PS or SB) as it comes off the bed.
- Hull first, on a fresh spool. It takes 970 g, nearly a whole 1 kg spool. Weigh the spool before you start, or be ready to change spools part-way through.
- Leave supports off. Every part was checked layer by layer (
design/egg/print_verify.txt): each layer stands on the one below. What overhangs remain are bridges of up to 20 mm (the tunnel roofs, the notch under the dome's flange, small round roofs) and ledges of up to 2.3 mm (the tops of the dome's O-ring grooves and its flange). If you switch supports on, the slicer will put them in the tunnels and under those roofs anyway, because by default it supports every bridge over 10 mm. They are not needed, and they would have to be dug out of the tunnels. - Print the ring next, then everything else in any order.
After each print
- Brim: take it off, outside and in. On the first layer the inner brim fills every hole and opening in the face that was on the bed: the six insert holes in the hull's bottom, the dish's and the deck's holes, and the grille slots in each plug's outer face. Pick each one out with a deburring knife or a pick.
- Hull: look over the bore and the outside under a light. The seam is random, so each loop starts in a new place: look for small blobs, and for any gap between layers, all over rather than along one line. Check the keyways are clean, and that each tunnel's 45° roof and flat top printed without strings hanging into the bore.
- Ring: trial-fit it on the hull's thread straight away. It has two starts, so it picks up at either of two positions. It should run on by hand with no binding. Take it off again. A ring printed before 2026-11-18 has half the thread clearance and is hard to screw on: print a new one from today's
ring.3mf. The hull needs no change. - Dome: check the two O-ring grooves are clean all the way round, and the notch under the flange at the bow.
- Everything: remove strings and any elephant's foot on the bed face with a deburring knife.
Check
Step 3 — Clean up, tap and fit inserts
Time: 1 h.
- Sand the bore. The dome's O-rings seal against the hull's bore, 205.6 mm across, just below the rim. Sand it smooth with 400 then 600 grit, taking off the small seam blobs scattered over it. Do not coat the bore with anything.
- Tap the gland columns. Each pod's leads come up through a column between the bulkheads, 20 mm sternward of the middle and 86 mm out to each side. Tap the 14.5 mm hole M16 × 1.5 from above, square to the column. The hole runs on down into the keyway.
- M4 inserts, hull bottom. Turn the hull over onto a padded surface. Press six M4 brass heat-set inserts into the six 5.6 mm holes in its bottom face (they take the dish's screws), square and flush.
- M3 inserts, rib tops. The four ribs inside the hull carry the deck. The bow-port rib has a peg; press an M3 heat-set insert into each of the other three, flush with the rib top.
- Grille plugs. Run each plug's rod hole through with a 4.5 mm drill.
- Key and notch. Set the dome on the hull without its O-rings: the notch under its flange must drop over the key in the hull's rim at the bow, and the dome must sit down on the rim all round.
Check
Step 4 — Seal the hull
Time: 30 min per coat, two coats, 24 h cure each.
An FDM print at six walls is close to watertight, not certain. A thin epoxy coat over the wet surfaces closes it.
- Wipe the hull with isopropyl alcohol.
- Mask the bore, the thread and the rim, everything above the shoulder. Put a dab of tape over each insert and each gland hole.
- Brush one thin coat of laminating epoxy on the hull's outside below the shoulder and inside both tunnels and keyways.
- Let it cure, scuff it lightly, and brush the second coat.
Tips
- Keep the coats thin: drips harden into bumps in the tunnels, and the pods need their clearance.
- Never let epoxy reach the bore or the thread. It would ruin the fit.
Check
Fit and test the shell: steps 5 to 7. The empty hull and dome are pressure-tested before anything goes inside.
Step 5 — Dome fittings and O-rings
Time: 30 min. You need: the SP13 socket; a bolt-in Schrader valve; two soft washers; two 195 × 3.5 mm NBR O-rings; silicone grease.
- SP13 socket in the 13.2 mm hole on the bow boss. Its flange and gasket go on the boss's flat outside face. Inside, put a soft washer under the nut: the inside is the bare 45° cone, not a flat face.
- Wire the SP13 as on the spar (
BUILD_GUIDE.mdstep 7.2): charge +, ground and control. Bring its lead down to a connector that will plug in at the deck, long enough to unplug with the dome lifted beside the hull. Make up the ON cap and the charge adapter as on the spar. - Test valve in the 8.5 mm hole on the stern boss, the same way, soft washer under the nut inside.
- O-rings. Grease both O-rings with silicone grease and roll them into the two grooves on the dome's spigot. They stretch about 3 % onto the grooves; do not roll them twisted.
Check
Step 6 — Dry-fit the joint
Time: 10 min.
- Turn the dome until the notch under its flange is over the key at the bow.
- Press it straight down. The O-rings make it a firm push-fit.
- Run the ring on, hand-tight: it closes in 1⅓ turns and presses the dome's flange down. The dome itself never turns.
- Unscrew the ring (anticlockwise) and lift the dome off again.
Check
Step 7 — Pressure test #1
Time: 30 min. Not before: 24 h after the second epoxy coat.
This tests the empty hull and dome together, before anything goes inside.
- Close the gland holes. Each column's hole runs through into its keyway, so the hull is open until the glands are in. Screw a gland into each column, its sealing washer on the column top, closed on a short length of 6 mm dowel or rod.
- Fit the dome and ring (step 6), with the ON cap on the SP13.
- Pump through the valve: about a litre of air, two or three strokes of a floor pump, to 0.1 bar (1.5 psi). Stop there.
- Submerge it in the tub. Empty, it floats hard: it takes about 8 kg of weight to hold it under. Watch for 10 minutes: the whole shell, the tunnels and keyways, the gland columns, the two fittings, and the joint.
To fix a leak: mark it, release the pressure, dry it, and give that area another thin coat of epoxy (never the bore or thread). Re-seat a leaking gland or fitting. Wait for any epoxy to cure and test again.
Check
Release the pressure, take the dome off and unscrew the blanks.
Fit it out: steps 8 to 11. Pods, battery and ESCs into the hull; the electronics on the deck.
Step 8 — Glands and pods
Time: 1 h. You need: two thruster pods; two M16 × 1.5 IP68 cable glands (4–8 mm clamp); 9 mm adhesive-lined heat-shrink; the four grille plugs; two 140 mm lengths of M4 A4 threaded rod; four M4 nylon-insert locknuts.


- Sleeve the leads. On each pod, slide adhesive-lined heat-shrink over its three wires where the gland will grip, and shrink it, so the gland seals on one round cable. Stagger the bullet connectors along the wires so they pass the gland one at a time.
- Pod into its tunnel. From one end, with that tunnel's plugs off, slide the pod in with its lug in the outboard keyway.
- Leads up through the gland. Feed the bullets up from the keyway through the column, into the dry hull, with the gland's seal insert slackened. Screw the gland into the column, its sealing washer on the column top, and tighten its dome nut on the heat-shrink.
- Plugs. Fit the plug marked for each end of the tunnel, keyway notch outboard, until it seats on the step 56 mm out from the middle. A plug of the wrong hand has its lobe on the inboard side and will not seat. Its sleeve presses on the end of the pod's duct.
- Tie rod. Push the rod through both plugs, in the roof above the pod. Fit a locknut on each end, in the hex pocket in each plug's outer face, and tighten until both plugs sit firmly on their steps.
- Repeat for the other tunnel.
Tips
- The thrust goes from the pod through the sleeve and plug into the step. The rod only holds the plugs in; it never takes thrust. Do not crush the plugs with it.
Check
Step 9 — Battery and ESCs
Time: 45 min, plus charging. You need: one Bioenno BLF-1206A 12.8 V 6 Ah LiFePO4 pack; an XT60 female plug; an inline blade-fuse holder for 12 AWG with a 15 A fuse; the two ESCs; zip ties.
- Gate check. Measure the pack over its wrap: no more than 108 × 69 × 64 mm. It lies flat between side posts with a millimetre to spare each side.
- Charge it fully on the bench.
- Lead. Cut off the Anderson Powerpole (Bioenno allows changing the connector; never open the pack) and fit, working away from the pack: the 15 A fuse holder in the red lead, then the female XT60, red to +. Tape the barrel charge socket closed and tuck it along the pack: it is live.
- ESCs. Stand each ESC on the bow bulkhead, outboard of the battery posts (ESC L on the port side), and tie it to the bulkhead. Join the port pod's bullets to ESC L's motor leads and the starboard pod's to ESC R's. All the bullets are on the dry side.
- Battery in. Lay the pack flat on the two carrying bulkheads, its 108 mm length fore and aft, between the side posts. The two narrow bulkheads at its ends stop it sliding. Leave its lead free to reach the deck.
Check
Step 10 — Deck and electronics
Time: 2 h. You need: the deck and antenna platform; the carrier PCB, GPS board, Feather and BMM150 compass board; the ANN-MB antenna; a 100 × 0.6 mm aluminium disc; eight M3 nylon standoffs (about 5 mm) and screws; three M3 screws for the deck; nylon screws for the compass board.
- Boards on the deck. Mount the carrier PCB (toward the bow) and the GPS board (toward the stern) on M3 nylon standoffs in the deck's two hole patterns.
- Compass on the starboard shelf, the lower of the two: flat and level, chip side up, JST connector toward the stern, with nylon screws. Firmware
.77's axis signs are measured for this position. Magnet-test every fastener near it: brass, nylon or stainless only. - Feather on the port shelf.
- Antenna. Lay the aluminium disc on the antenna platform and the ANN-MB on the disc. Use aluminium: tinplate is steel, beside the compass. Slip the platform's socket over the top of the mast.
- Wire it as the spar's sled (
BUILD_GUIDE.mdstep 6.3 andWIRING_GUIDE.md): ESC L power to J4 and signal to J8; ESC R to J3 and J9; GPS to J5; compass to J6; the Feather on J7; the SP13 lead to J2 through its 5 A fuse. Screw the antenna's SMA onto the GPS board: finger-tight, then a slight nip. - Lower the deck in. The battery lead, the ESC leads and the SP13 lead come up through the deck's cable holes on service loops long enough that the deck can be lifted clear before anything is unplugged. Lower the deck by its two finger holes until its peg hole drops over the peg on the bow-port rib.
- Screw it down with three M3 screws into the rib inserts. It sits 3 mm above the battery, so it holds the battery in if the buoy is ever upside down.
Check
Step 11 — Close up and pressure test #2
Time: 30 min.
- First power-up. Plug the battery into J1 and the SP13 lead into its connector. Fit the ON cap. The carrier's red and green LEDs light and both ESCs chirp. Take the ON cap off again.
- Add a desiccant sachet on the deck.
- Close it: grease the O-rings, turn the dome until the notch drops over the key at the bow, press it down, and run the ring on hand-tight.
- Pressure test #2 through the valve, as in step 7: 0.1 bar, 10 minutes submerged. Watch the glands, the fittings and the joint.
Check
Test and trim: steps 12 to 15. The electronics on the bench, then the buoy in the water.
Step 12 — Bench test
Time: 30 min. Fit the ON cap and connect from the Console over Bluetooth.
| Send | Expect |
|---|---|
command:version | the firmware line. Battery: none is normal; GNSS: ok |
command:i2cscan | 0x42 (GPS) and 0x13 (compass) both answer |
command:escdiag | both ESCs attached |
command:thrust:20, then command:stop | both propellers blow air out of the stern grilles |
command:thrust:-20, then command:stop | both blow out of the bow grilles |
- A propeller blows the wrong way: open the dome and swap any two of that pod's bullets.
- Nothing happens on the negative command: that ESC does not reverse. Replace it with a bidirectional ESC.
- The pods are running dry: keep runs to a few seconds.
Stop check. A bidirectional ESC sets its neutral band when it arms, and the band may not be centred on the pulse the buoy sends for stop.
- Send
command:stop. Within a few seconds both propellers must be still. - If one keeps turning, note which way. Step that ESC's trim (
trlfor the left,trrfor the right) by 2 µs at a time, opposite in sign to the creep: forward creep, negative trim. For examplecommand:gains:trl=-2, then-4, sendingcommand:stopafter each. - Note the first trim at which it is still, then keep stepping until it turns the other way. Set the trim halfway between the two.
- Check that
command:thrust:20andcommand:thrust:-20still turn it both ways, thencommand:gains:save.
Charge test. Take the ON cap off and fit the charge adapter. The charger shows that it is charging and the buoy stays off.
Check
Step 13 — Compass and float trim
Time: 2 h. You need: lead shot in small zip bags; the kitchen and luggage scales; a retrieval line.
- Compass calibration. Outdoors, away from cars and steel benches, with the buoy closed. In the Console, right-click the buoy on the Mesh tab, Calibrate compass…, Start turn, and turn the buoy slowly and level through two full turns, about a minute each. When the window says Good fit, check the declination and Send to buoy. From firmware
.70the buoy refuses Hold Pos and Go Home until this is done. Then turn the buoy to the right and see the heading rise: a board lying chip side down calibrates cleanly and reads backwards. - Weigh the buoy on the luggage scale, without any lead and without the dish, which stays off until step 15. The design figure is 3.6 kg.
- First ballast = 5.56 kg minus your figure. Without its dish the buoy floats at the design waterline at about 5.56 kg, so the design figure for loose lead is about 1.97 kg. Weigh it into small bags, each inside a second bag, air squeezed out.
- Load it. Open the buoy (appendix A), lift the deck, and lay the bags in the low dry pockets outboard of the keel, as much to port as to starboard. Close it.
- Float test, in calm water at least 0.5 m deep, on a retrieval line. Target: floating upright with the water about 5 mm below the shoulder, 7 mm below the ring's lower edge.
- Trim. Each millimetre of waterline is about 44 g of lead: floating high, add lead; floating low, take some out. Two rounds are usually enough.
- Soak. Leave it floating for 30 minutes, then open it and look for water.
- Record the all-up weight and the total loose lead on board. Step 15 uses them.
Tips
- Trim with everything aboard as it will be used: ON cap, desiccant, the lot.
- A flooded hull sinks. Keep the retrieval line on until the buoy has earned trust.
Check
Step 14 — Thrust, current and the one-pack ceiling
Time: 1 h. You need: the luggage scale; the clamp meter; a tub or calm shallow water.
The egg carries one battery pack, rated 12 A continuous. The firmware's hard ceiling, MAX_THRUST (400 µs), was set for the spar's two packs and an estimated 12–15 A with both pods flat out. Until that ceiling is lowered in firmware (a change not yet made), the safe limit is the tmax you set here.
- Rig it. Float the trimmed buoy in the tub and tie it to the luggage scale, in line with the thrust. Put the clamp meter on the battery lead (open the dome to reach it; close it again for the run if you can).
- For each of 75, 150 and 250: allow it first (for example
command:gains:tmax=150), sendcommand:thrust:N, read the pull and the current once they steady, thencommand:stop. Write both down. Stop climbing as soon as the current nears 10 A. - Compass under power. Note the heading with the motors stopped, then at your highest setting. If it shifts by more than about 2°, the compass is too close to the motors or their current. Try the compass on the other shelf, or a non-magnetic antenna mount; if that fails, this hull needs another heading source.
- Set the ceiling. Choose
tmaxat or below the setting that kept both pods under about 10 A, withsmaxabout three-quarters of it, for examplecommand:gains:tmax=150,smax=110. Thencommand:gains:save.
Tips
- The grilles block about 35 % of each tunnel mouth, and a duct inside a tunnel loses something too, so the pull is lower than the pod's rating. The surge gains scale inversely with the pull per microsecond.
- If the thrusters cut out a few seconds into a run, the pack's protection board has tripped: lower
tmax. Fit the charge adapter for a few seconds to reset the pack.
Check
After the float test: step 15. One evening to cast, a day to cure, an hour to finish.
Step 15 — Cast the ballast and first water
Time: 45 min, 24 h cure, then 1 h. Not before: steps 13 and 14 are passed. You need: the lead from the float test; slow-cure epoxy; six M4 × 30 A4 cap screws; 4 mm cord and a small float.
The lead is cast into the dish so it cannot shift, then the dish is screwed under the hull. The dish holds up to 2.52 kg of cast lead against 2.30 kg needed: a small margin.
The cast weighs more than the loose lead. The float test ran without the dish. Once it is on, the dish and its cast displace 0.47 L of water, and the dish and its screws weigh 0.14 kg, so the buoy gains 0.33 kg of lift. The cast makes that up.
- Work out the amounts. Weigh all the loose lead from the float test; call it L. The cast is C = L + 0.33 kg. It is about 60 % shot by volume, so by weight it is about 94 % lead and 6 % epoxy: shot = C ÷ 1.065, and epoxy is the rest. With the design figure L = 1.97 kg, C = 2.30 kg: about 2.16 kg of shot and 140 g of epoxy.
- If C is more than 2.52 kg, cast 2.52 kg and keep the rest, C − 2.52 kg, as loose bags in the pockets.
- Prepare the dish. Stand it open side up on a level bench. Plug the six screw holes through their bosses (greased M4 screws work) and keep the rope eye clear.
- Pour the shot in, and tap the dish until it lies level. Keep the top of the lead below the dish's rim, so the dish seats on the hull.
- Pour the epoxy. Mix it by weight and pour it in a thin stream in two or three goes, tapping between pours, until a wet film just covers the shot.
- Leave it level for 24 hours. Then pull out the plugs.
- Fit the dish. Take the loose lead out of the hull. Turn the buoy upside down on a padded bucket and screw the dish on with the six M4 × 30 screws into the hull's inserts. Firm, not crushing.
- Confirm. Weigh the buoy: about 0.47 kg more than at the float test. Float it again: the water should again be about 5 mm below the shoulder. If not, correct with a small trim bag in the pockets (about 44 g per millimetre).
- Retrieval line. Tie 4 mm cord through the rope eye in the dish, with a small float on it.
- Self-righting. In the water, roll the buoy over by hand, through every angle including fully upside down: it must come upright from each.
Tips
- Use slow epoxy. Fast epoxy heats up in this volume and sets before it has flowed through the shot.
- The dish is PLA, which softens from about 55 °C, and the epoxy warms as it cures. Cast in a cool room. For a cast over about 2 kg, do it in two layers a day apart, with half the shot and half the epoxy each time.
First-water checklist
First tests on the water. The design leaves these to a real buoy:
- Wake behaviour: log position and heading through a few boat passes, beside a spar if one is built. A ball rides every wake.
- Radio range: the Feather sits about 50 mm above the water; range-test two buoys early.
- Strike: push a ski into it in the water and see what it does, before anyone skis at it.
Appendix A — Opening it up
- ON cap off.
- Ring: unscrew it 1⅓ turns anticlockwise and lift it off over the dome.
- Dome: lift it straight up; the O-rings make it a firm push-fit. Unplug the SP13 lead at the deck.
- Deck: undo its three M3 screws and lift it out by the two finger holes. The electronics come with it on their service loops; unplug the battery at J1 and the ESC leads if it must come away completely.
- Battery: lift it out of its posts.
The ESCs, glands and pod leads are then in plain view.
To close it: grease the O-rings, turn the dome until the notch under its flange drops over the key at the bow, press it down, and run the ring on hand-tight. Pressure-test through the valve at 0.1 bar after any reassembly that disturbed the seal (step 7).
Charging and switching on never need it opened: both are done at the SP13 on the dome.
Appendix B — Swapping a pod
- Open the dome (appendix A) and unplug the pod's three bullets.
- Loosen the gland's dome nut and slacken its seal insert.
- Undo the two nuts on that tunnel's rod, draw the rod out, and pull one plug.
- Slide the pod out, drawing its wires down through the gland one bullet at a time.
Refitting is the reverse (step 8). No splicing is needed. Repeat the bench test's direction and stop checks (step 12) and pressure test (step 7).
Appendix C — Routine checks
Before each launch
- Ring hand-tight; valve cap on.
- Grilles clear; no line or weed in the tunnels.
- ON cap fitted last; both ESCs chirp.
After each outing
- ON cap off. Rinse the tunnels with fresh water.
- Charge through the SP13.
- Store it in the shade, never in a car: PLA softens from about 55 °C.
- Between outings, store it with the ring off and the dome lifted out. The O-rings press on the dome's spigot and the hull's bore all the time, and PLA slowly gives under a constant load.
Each season, and after any knock
- Pressure test (step 7).
- Open it: look for water, swap the desiccant, wipe and re-grease the O-rings.
- Inspect the shell, ring and plugs for cracks, especially after a strike.
- Check both glands are tight and the tie rods hold the plugs firmly.
- Re-check the compass calibration if anything on the deck changed.
- Re-weigh and re-trim if anything was added, removed or replaced.
- Store the pack at about half charge, indoors, over winter.
Appendix D — Troubleshooting
| Symptom | Likely cause | Remedy |
|---|---|---|
| Ring will not start | thread dirty, or a string in it | clean the thread; it starts at either of two positions half a turn apart |
| Ring stiff all the way on | a ring printed before 2026-11-18 (half the clearance), or seam blobs on the thread | print a new ring from today's ring.3mf; pick blobs off the thread crests and grease it |
| Dome hard to push in | dry O-rings, or seam blobs proud in the bore | grease the O-rings; sand the bore smooth with 600 grit |
| Pressure falls but no bubbles are found | valve core, or the SP13's seal | check the valve tip under water; re-seat the fitting |
| Bubbles from the shell | a gap between layers, or at a seam start | dry it and give it another thin coat of epoxy; never the bore or thread |
| Bubbles at a gland | gland not tight on the heat-shrink, or its washer | re-seat the washer; tighten the dome nut |
| A pod rattles or turns | plugs not seated, or the lug out of its keyway | re-seat the pod and plugs; tighten the tie rod |
| Thrusters cut out a few seconds into hard thrust | the pack's protection board tripped: 12 A continuous | lower tmax; reset the pack by fitting the charge adapter for a few seconds |
| Heading shifts when the motors run | the compass is 170 mm from the motors | step 14, item 3 |
| Heading reads backwards after a clean calibration | compass board chip side down | mount it chip side up, connector aft; recalibrate |
| Floats high or low | real weights differ from the design figures | trim: about 44 g per millimetre (step 13) |
| Floats tilted | loose lead or battery off centre | lay the bags evenly port and starboard; re-seat the battery |
| One propeller pushes the wrong way | two motor phases swapped | swap any two bullets on that pod |
| ESCs do not chirp | ON cap not making contact, or battery plug off J1 | check the cap's link; check J1; look for the carrier's LEDs |
Appendix E — Dimensions on one page
| Item | Value |
|---|---|
| Buoy | 236 dia × 351 tall assembled; z from the dish's underside |
| Hull | 236 dia × 198 tall; skin 2.6 (six perimeters); shoulder z 205; rim z 223 |
| Sealing bore | 205.6 dia, z 191–217, then a 6 mm 45° lead-in to the rim |
| Thread | two-start, 6 pitch, 12 lead, 2 deep, 45° flanks; 1.0 radial and 0.7 axial clearance (in the ring); closes in 1⅓ turns |
| Ring | 236 dia, z 207–234; 5 lip; 20 grip flutes |
| O-rings | two, 195 × 3.5 NBR 70, in grooves on the dome's spigot (groove bottom 200 dia, 4.7 wide); 20 % squeeze, 2.6 % stretch |
| Key | 10 wide at the bow, standing in the hull's countersink; notch under the dome's flange |
| Dome | 221 dia flange, top z 351; wall 2.6; SP13 (13.2 hole) at the bow and valve (8.5 hole) at the stern, z 300, each on a boss 2.5 proud |
| Tunnels | 72 bore, axes 84 apart (42 either side of the centre line) at z 65; teardrop roof with a 20 flat; keyway 22 × 8 outboard with a 45° roof; plug seats 56 from the middle, bore 2 larger |
| Pods | duct 69 dia × 75 long, resting on the bore floor |
| Grille plugs | 6 thick; sleeve 71 / 63 dia × 18.2 long, 16 notch for the lug; bars 3 wide, 7.5 gaps; M4 rod hole 4.5, z 104 |
| Tie rods | two, M4 A4, about 132 between the plugs' outer faces; 140 cut |
| Glands | M16 × 1.5 in tapped columns (14.5 hole), 20 sternward of the middle, 86 each side; column tops z 92 |
| Battery | one 12.8 V 6 Ah LiFePO4 pack (Bioenno BLF-1206A), 108 × 69 × 64, lying flat at z 113; 15 A fuse in its lead |
| ESCs | on the bow bulkhead, outboard of the battery |
| Deck | 204 dia × 4, underside z 180; three M3 screws into rib inserts, peg on the bow-port rib |
| Mast | 26 dia tube, top z 276; compass shelf (starboard) z 225, Feather shelf (port) z 250 |
| Antenna | ANN-MB on a 100 × 0.6 aluminium disc on the antenna platform |
| Ballast dish | 180 dia × 25; six M4 × 30 A4 screws into inserts on a 104 circle; rope eye: two 7 holes 24 apart |
| Ballast | about 2.30 kg of lead cast in epoxy (design figure; the float test decides): the float test's loose lead plus 0.33 kg. The dish holds 2.52 kg |
| All-up weight | about 6.0 kg; 3.6 kg without lead or the dish |
| Waterline | z 200: 5 below the shoulder; about 44 g of lead moves it 1 mm |
| Self-righting | GM 54; rights itself from any angle |
| Pressure test | 0.1 bar (1.5 psi) for 10 minutes, submerged; hand pump only |